Lift replacement – staircase closure

The project to replace the central lifts starts at 5pm this Friday!

The central lifts and stairs will be closed to all Library users from 5pm on Friday 22nd May until 7.15am on Saturday 23rd May.  This is to allow the project team to install protective hoardings round each lift entrance.

Once the project is up and running you’ll be able to access the central stairs between levels 3 and 10. Access to and from levels 2 and 11 will be closed for the duration of the project, as these will be the main access points for the lift engineers and other contractors. You’ll still be able to access every level of the library, including the annexes, from the tower 5 lifts and stairs (opposite the Library Services desk).

We’ll post regular updates here to let you know how the project is progressing.

WP_20150514_002



Categories: Library, Library Improvements

Tags: , , , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: